PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Burned metal decking at the high roof for the metal stairs Facing North.jpg Electrical rouging at the 2nd floor Facing East.jpg Installed metal furring at Stair -4 shear wall Facing East.jpg Installing duct work at the 4th floor Facing East.jpg Installing duct work at the 4th Floor Facing South.jpg Roof Insulation material Facing South (2).jpg Roof Insulation material Facing South.jpg Roof Insulation material Facing West.jpg Started installing sprinkler main raiser at the 4th floor Faacing North.jpg
Previous pageNext page Installing duct work at the 4th Floor Facing South
Installing duct work at the 4th Floor Facing South